Plans for FY 2023-24:
9.075 km of river bank conservation, 9.150 km of river dredging, 24.200 km of river excavation, 11.000 km of embankment repair, 34.775 km of drainage canal re-excavation work and 2.000 km length of tree plantation to prevent river erosion and It will be possible to provide flood relief and environmental balance and drainage facilities.
Planning and Implementation: Cabinet Division, A2I, BCC, DoICT and BASIS